LOCATION: Saltillo
TYPE OF WASTE ADDRESSED: Motion
DATE: 06/21/2025
NAME: HECTOR CARDONA
DEPARTMENT: Operations
BEFOREBEFORE
AFTERAFTER
IMPROVEMENTS

One Team Member per Shift is now, not required to assembly the Filler Neck.
By injecting at the same time, IMM-08 is besides IMM-09 and IMM-18 is almost in front of them.
So, the same Team Member takes the parts from the 3 presses and makes the assembly by him/her-self