| LOCATION: | Saltillo |
|---|
| TYPE OF WASTE ADDRESSED: | Extra Processing |
|---|
| DATE: | 02/26/2026 |
|---|
| NAME: | HECTOR DE LA ROSA |
|---|
| DEPARTMENT: | Maintenance |
|---|
| BEFORE |  |
|---|
| AFTER |  |
|---|
| IMPROVEMENTS | A mixing device was installed to prevent resin and pigment separation inside the hopper.
Previously, poor mixing caused:
Off-color parts
Machine stoppages
Purging of incorrectly mixed material
The technician had to intervene 3–4 times per shift, purging approximately 1 lb of material per event.
Average purge events per shift: 3.5
Material purged per event: 1 lb
Material cost: $2.20 USD/lb
Additional Benefits (Not Included in Calculation)
Reduced machine downtime
Increased process stability
Elimination of color defects
Reduced technician interventions
Improved product quality
Lower risk of customer rejection
|