| LOCATION: | Brampton |
|---|---|
| TYPE OF WASTE ADDRESSED: | Waiting |
| DATE: | 03/25/2026 |
| NAME: | Shamiran Odesho |
| DEPARTMENT: | Operations |
| BEFORE | |
| AFTER | |
| IMPROVEMENTS | Assigning any Material preparation that requires 4 hours of drying to Night shift, eliminating the waiting time for material to dry after mold change on day shift. |
