← Go back
| LOCATION: | McPherson |
|---|
| TYPE OF WASTE ADDRESSED: | Motion |
|---|
| DATE: | 03/30/2026 |
|---|
| NAME: | Daniel Dick |
|---|
| DEPARTMENT: | Operations |
|---|
| BEFORE |  |
|---|
| AFTER |  |
|---|
| IMPROVEMENTS | Added a cheater bar to the fixture at A6. Giving the operator more leverage to stamp the holes in the part.
|