LOCATION: Clyde
TYPE OF WASTE ADDRESSED: Defects
DATE: 05/08/2026
NAME: Jose Rayo
DEPARTMENT: Quality
BEFORE
AFTER
IMPROVEMENTS

Better door sequence manual workstation.
At the manual workstation the screw sequence was adjusted to cross-tighten all the 4 bolts that are manual assembled to improve the alignment condition and help the robot to decrease downtime due related failures.