LOCATION: Saltillo
TYPE OF WASTE ADDRESSED: Extra Processing
DATE: 06/08/2026
NAME: Ivan Rivera
DEPARTMENT: Maintenance
BEFOREBEFORE
AFTERAFTER
IMPROVEMENTS

Before
operator removes parts from under the clamp for inspection; operator is in an awkward position.

After
The end-of-arm assembly is manufactured, and parts are removed by robot and placed outside the IMM onto a worktable, eliminating the need for the operator to bend down to pick up the parts.