| LOCATION: | Fraser |
|---|---|
| TYPE OF WASTE ADDRESSED: | Extra Processing |
| DATE: | 07/20/2026 |
| NAME: | STORM LEWIS |
| DEPARTMENT: | Quality |
| BEFORE | |
| AFTER | |
| IMPROVEMENTS | Added quick connect to better APC leak testing fixture to eliminate need for clamping during leak test. |
| LOCATION: | Fraser |
|---|---|
| TYPE OF WASTE ADDRESSED: | Extra Processing |
| DATE: | 07/20/2026 |
| NAME: | STORM LEWIS |
| DEPARTMENT: | Quality |
| BEFORE | |
| AFTER | |
| IMPROVEMENTS | Added quick connect to better APC leak testing fixture to eliminate need for clamping during leak test. |