LOCATION: Saltillo
TYPE OF WASTE ADDRESSED: Defects
DATE: 08/24/2026
NAME: Ivan Rivera
DEPARTMENT: Maintenance
BEFORE
AFTERAFTER
IMPROVEMENTS

On floors 1 and 2, process water flow was available, but there was no pressure. A second pump is being installed to supply water to the process and increase both the pressure and the flow to 20 PSI.