LOCATION: Saltillo
TYPE OF WASTE ADDRESSED: Extra Processing
DATE: 08/31/2026
NAME: Hector De la rosa
DEPARTMENT: Maintenance
BEFOREBEFORE
AFTERAFTER
IMPROVEMENTS

A new End-of-Arm Tool (EOAT) was installed on the robot, allowing the process to run more efficiently and reducing the cycle time from 110 seconds to 85 seconds.
Item Value
Cycle Before 110 sec
Cycle After 85 sec
Cycle Reduction 25 sec
Monthly Demand 1,000 parts
Time Saved 6.95 hrs/month
Annual Direct Savings $917 USD

This Kaizen improved productivity through EOAT automation, reduced production time, and increased available machine capacity without additional equipment investment