← Go back
	
					
							
			
				| LOCATION:  | Brampton | 
|---|
| TYPE OF WASTE ADDRESSED:  | Motion | 
|---|
| DATE:  | 04/10/2024 | 
|---|
| NAME:  | Shamiran Odesho | 
|---|
| DEPARTMENT:  | Operations | 
|---|
| BEFORE |   | 
|---|
| AFTER |   | 
|---|
| IMPROVEMENTS | Eliminated the unnecessary motion of aligning the slot of the part from the back of the fixture, subsequently faster assembly cycle time. 
 |