Brampton ← Go back LOCATION: BramptonTYPE OF WASTE ADDRESSED: WaitingDATE: 05/21/2025NAME: Jay CorbettDEPARTMENT: OperationsBEFOREAFTERIMPROVEMENTSBefore the end arm tooling used to pick one part at a time causing longer cycle time ( 7 sec.). the team changed the design to allow the arm to pick both parts at the same time saving 2 second on a cycle. /wp-content/uploads/2016/04/revere_logo_new2-1-300x138.png 0 0 Derek Swanson /wp-content/uploads/2016/04/revere_logo_new2-1-300x138.png Derek Swanson2024-04-16 18:30:422025-06-27 15:36:25Brampton