Brampton

LOCATION: Brampton
TYPE OF WASTE ADDRESSED: Waiting
DATE: 05/21/2025
NAME: Jay Corbett
DEPARTMENT: Operations
BEFOREBEFORE
AFTERAFTER
IMPROVEMENTS

Before the end arm tooling used to pick one part at a time causing longer cycle time ( 7 sec.). the team changed the design to allow the arm to pick both parts at the same time saving 2 second on a cycle.