LOCATION: Saltillo
TYPE OF WASTE ADDRESSED: Extra Processing
DATE: 06/27/2025
NAME: Hector De la Rosa
DEPARTMENT: Maintenance
BEFOREBEFORE
AFTERAFTER
IMPROVEMENTS

Kaizen Summary – Mold Change Time Reduction
1-Hour Reduction in Mold Change Time

Background:
Mold changes previously took an average of 3 hours. A process improvement was implemented that reduced the mold change time by 1 hour per change.

Implemented Action:
The cooling system connections on the mold were visually identified to speed up reconnections:

Blue color for inlet water lines

Red color for outlet water lines

This visual aid allows technicians to connect and disconnect cooling lines faster and more accurately, reducing mistakes and downtime during mold changes.

Mold Change Frequency:

3.5 changes per day

4 days per week

52 weeks per year

Annual Time Savings:

1 hour saved × 3.5 changes/day × 4 days/week × 52 weeks
= 728 hours saved annually

Labor Cost Basis:

Monthly salary of mold technician: $30,000 MXN ($1,765 USD)

Annual salary: $360,000 MXN ($21,176 USD)

Hourly labor cost: $173.08 MXN/hour ($10.18 USD/hour)

Estimated Annual Savings (Labor Only):

728 hours × $10.18 USD/hour
= ~$7,409 USD per year

Conclusion:
This Kaizen reduced mold change time by 33%, with a simple but effective visual improvement to the mold’s cooling line connections. The result is an estimated 728 hours saved per year and $7,409 USD in labor cost savings, along with enhanced process standardization and safety.

Kaizen Summary – Mold Change Time Reduction
Title:
1-Hour Reduction in Mold Change Time

Background:
Mold changes previously took an average of 3 hours. A process improvement was implemented that reduced the mold change time by 1 hour per change.

Implemented Action:
The cooling system connections on the mold were visually identified to speed up reconnections:

Blue color for inlet water lines

Red color for outlet water lines

This visual aid allows technicians to connect and disconnect cooling lines faster and more accurately, reducing mistakes and downtime during mold changes.

Mold Change Frequency:

3.5 changes per day

4 days per week

52 weeks per year

Annual Time Savings:

1 hour saved × 3.5 changes/day × 4 days/week × 52 weeks
= 728 hours saved annually

Labor Cost Basis:

Monthly salary of mold technician: $30,000 MXN (~$1,765 USD)

Annual salary: $360,000 MXN (~$21,176 USD)

Hourly labor cost: $173.08 MXN/hour (~$10.18 USD/hour)

Estimated Annual Savings (Labor Only):

728 hours × $10.18 USD/hour
= ~$7,409 USD per year

Conclusion:
This Kaizen reduced mold change time by 33%, with a simple but effective visual improvement to the mold’s cooling line connections. The result is an estimated 728 hours saved per year and $7,409 USD in labor cost savings, along with enhanced process standardization and safety

Share this entry
  • Share on WhatsApp
/wp-content/uploads/2016/04/revere_logo_new2-1-300x138.png 0 0 Derek Swanson /wp-content/uploads/2016/04/revere_logo_new2-1-300x138.png Derek Swanson2024-04-16 18:30:422026-03-10 14:13:47Saltillo
Search Search

Revere Plastics Systems, LLC is headquartered in Novi, Michigan. With over 50 years of experience in plastics and manufacturing, Revere has the leadership and insight to help meet all our clients’ needs and demands.

For over the past 25 years Revere Plastics Systems has remained in the top 100 plastic injection molders with presses ranging in 25 – 3,300 tons.

Let’s Talk!
888-430-7323

Copyright Revere Plastics Systems. 2024
  • Home
  • Terms and Conditions
  • News
  • Transparency in Coverage
Link to: Safety All Submitted Data Link to: Safety All Submitted Data Safety All Submitted Data
Scroll to top Scroll to top Scroll to top