| LOCATION: | Saltillo |
|---|
| TYPE OF WASTE ADDRESSED: | Extra Processing |
|---|
| DATE: | 01/31/2026 |
|---|
| NAME: | HECTOR DE LA ROSA |
|---|
| DEPARTMENT: | CI |
|---|
| BEFORE | |
|---|
| AFTER |  |
|---|
| IMPROVEMENTS | A strategic assignment plan was developed.
Each technician is now responsible for a specific bay/machines.
Responsibilities are clearly defined.
Technician time during the shift is better utilized.
With this strategy, response time is reduced to a maximum of 15 minutes.
Result
Faster response time.
Reduced downtime.
Lower scrap.
Better mold change control.
Improved raw material control.
Higher machine productivity.
|