Saltillo

LOCATION: Saltillo
TYPE OF WASTE ADDRESSED: Extra Processing
DATE: 01/31/2026
NAME: HECTOR DE LA ROSA
DEPARTMENT: CI
BEFORE
AFTERAFTER
IMPROVEMENTS

A strategic assignment plan was developed.

Each technician is now responsible for a specific bay/machines.

Responsibilities are clearly defined.

Technician time during the shift is better utilized.

With this strategy, response time is reduced to a maximum of 15 minutes.

Result

Faster response time.

Reduced downtime.

Lower scrap.

Better mold change control.

Improved raw material control.

Higher machine productivity.