Saltillo

LOCATION: Saltillo
TYPE OF WASTE ADDRESSED: Waiting
DATE: 04/25/2025
NAME: Oscar Flores
DEPARTMENT: Maintenance
BEFOREBEFORE
AFTERAFTER
IMPROVEMENTS

With this better I avoid my machine stopping and having to wait to repair each hose or connector damaged by the pressure accumulated by overheating which the hour would lose 500dlls which the average year each machine fails 12 times a year 1 time per month and assuming that the minimum repair takes 1.5 hours I would be saving 9000 dlls a year