last | first | Ankeny | Department | 02/13/2024 | 02/13/2024 | |||
Walper | Katelyn | Fraser | Hr | 05/22/2025 | Can we get air guns to blow out material? | 05/22/2025 | ||
last | first | Auburn | Department | 02/14/2024 | 02/14/2024 | |||
Walper | Katelyn | Fraser | HR | 05/13/2025 | Material spills on the floor I cleaned up all three piles | 05/13/2025 | ||
Watson | Danny | Fraser | Die Setter | 05/21/2025 | Grinder not in a well vented area. Contaminant's of grinder material are being exposed to employees and getting on machine. | Better ventilated or tarps | 05/21/2025 | |
White | JR | Ankeny | Quality | 06/12/2024 | 06/12/2024 | |||
last | first | Brampton | 02/15/2024 | 02/15/2024 | ||||
Walper | Katelyn | Fraser | Hr | 05/20/2025 | 2 presses in c bay were full of material on the floor. Shared picks in morning meeting. | I cleaned it up | No | 05/20/2025 |
Kinnie | Tyler | Fraser | Tech | 05/07/2025 | A29 | The robot cage is falling apart and making the job unsafe. Needs to be looked at soon! | 05/07/2025 | |
Bena | Mike | McPherson | 04/29/2024 | B07 | Oil leaking into overflowing container. Maintenance cleaned spill on ground and emptied full container. | Maintenance waiting on part to repair oil leak. | 04/29/2024 | |
Walper | Katelyn | Fraser | Hr | 05/21/2025 | B15 had material everywhere and on top of the machine. Not cleaned up. I spoke to Malcomb to talk to Karla about it. | I cleaned it up and Alan Warthen helped. | No | 05/21/2025 |
Narcisi | Art | Auburn | CI | 04/20/2024 | Behind presses | Loose panels from the press leaned up against wall. Panels placed back on press. | 04/20/2024 | |
Beadle | Brian | Fraser | Management | 05/20/2025 | Between D7 and B4 | Valve gate unit put in aisle during set up causing not much room to maneuver Hilo to get material to the presses. | Find a better spot for the valve gate unit moving forward. | 05/20/2025 |
Narcisi | Art | Auburn | CI | 04/26/2024 | Between presses | Loose material, trash, cardboard, and oil on the floor. Cleaned area, placed everting back in it's proper place, and informed Maintenance of the oil. | Fix oil leaks | 04/26/2024 |
Wells | Angie | Fraser | Operation | 04/29/2025 | C-bay C26 | Oil leaking from the press onto floor towards operator area | Several times this press has been written up for the same problem | 04/29/2025 |
Kinnie | Tyler | Ankeny | 04/29/2025 | C25 Oil leaking from behind the press and leaking to the front making the walk ways slick | Oil leak on c25 | 04/29/2025 | ||
Beadle | Brian | Fraser | Management | 04/30/2025 | C26/c25 | Oil leaking from one or both of the presses causing a major slip hazard. Cleaned up what we could. | Needs to be addressed immediately so that no one is injured slipping on the oil. | 04/30/2025 |
Wells | Angie | Fraser | Operation | 05/19/2025 | Cbay C14 | It was a change to the work cell layout. | Boxes,bins all over the work area.Nothing was organized | 05/19/2025 |
Kljajic | Seida | Fraser | operations | 04/29/2025 | cbay c26 oli on the floor | 04/29/2025 | ||
Walper | Katelyn | Fraser | He | 05/22/2025 | D bay | Material resin on ground by press in d bay Malcomb addressed his employees to clean it up | 05/22/2025 | |
Walper | Katelyn | Fraser | Hr | 05/22/2025 | D bay | By b 4 there were a bunch of boxes left and built. Malcomb and I broke them down and cleared them out of the way! | 05/22/2025 | |
Beadle | Brian | Fraser | Management | 04/30/2025 | F2 | Machine has a bad oil leak that is coming out where the process techs have to stand when restarting. | Need the machine fixed ASAP to stop oil from making the floor slippery and causing potential accidents. | 04/30/2025 |
Beadle | Brian | Fraser | Management | 04/30/2025 | F5 | Oil leaking from machine both sides. Tried to clean what we could but there are oil blankets and absorbent to try and stop oil from spreading further that has been there for weeks. | Oil leaks need to be repaired asap. This is a major slip hazard. | 04/30/2025 |
Beadle | Brian | Fraser | Management | 05/20/2025 | Floor | Spoke with Latrice Heard about wearing side shields whenever she is in the plant. Eric spoke with Patrick Freeman about wearing side shields. Both were given another set of shields for their glasses. | Continue to monitor employees. | 05/20/2025 |
Beadle | Brian | Fraser | Management | 04/30/2025 | Floor | Shana came to me at start of the shift for side shields for her new glasses. New temp Miquel was given a pair of glasses at the start of the shift. | Na | 04/30/2025 |